News center

Company News

What are the installation steps for an electromagnetic dry powder magnetic separator?

2024-07-11

The correct installation of electromagnetic dry powder magnetic separator is an important link to ensure its efficient operation and extend the service life of the equipment. The following are the detailed installation steps for the electromagnetic dry powder magnetic separator:

1. Preparation work

Preparation of tools and materials

-Basic tools: such as wrenches, screwdrivers, pliers, hammers, level gauges, etc.

-Lifting equipment: such as cranes or forklifts, used for transporting and installing magnetic separators.

-Installation materials: such as bolts, gaskets, seals, etc.

-Electrical equipment: such as cables, electrical control boxes, wiring terminals, etc.

Environmental preparation

-Site cleaning: Clean up the installation site to ensure that the ground is flat, dry, and free of debris.

-Basic preparation: According to the equipment foundation drawings, pour and solidify the equipment foundation to ensure that it is level and firm.

Check equipment

-Equipment inspection: Check whether the equipment is intact and ensure that all components are complete.

-Accessory inspection: Check the installation accessories provided with the equipment to ensure that there are no omissions or damages.

2. Basic installation

Determine installation location

-Installation location: Determine the installation location of the equipment according to the design drawings to ensure accurate positioning.

-Basic marking: Mark the installation position and fixing bolt hole position of the equipment on the equipment foundation.

Fixed foundation bolts

-Bolt installation: insert the foundation bolt into the reserved hole, and adjust the bolt position to align it with the equipment base hole.

-Fixed bolts: Use cement or chemical anchoring agents to fix the foundation bolts, and continue installation after they have solidified.

3. Equipment in place

Lifting equipment

-Lifting preparation: Use a crane or forklift to lift the equipment smoothly, avoiding tilting or collision.

-Protective measures: Soft materials should be added to the surface and lifting points of the equipment to prevent scratches on the surface.

Equipment in place

-Equipment alignment: Slowly place the equipment on the foundation, align it with the bolt holes on the foundation, and ensure that the equipment base is tightly attached to the foundation.

-Preliminary fixation: Use nuts to preliminarily fix the equipment base and foundation bolts to ensure that the equipment does not shake.

4. Horizontal adjustment

Horizontal measurement

-Level measurement: Use a level to measure the levelness of the equipment and adjust the horizontal state of the equipment base.

-Adjusting shims: Add shims between the equipment base and foundation to adjust the height and levelness of the equipment.

Fixed equipment

-Tighten bolts: After adjusting the equipment to a horizontal position, tighten the foundation bolts one by one to ensure that the equipment is firmly fixed on the foundation.

-Check the level: Use the level again to check the levelness of the equipment and ensure that it is in a horizontal state.

5. Electrical connection

Power supply connection

-Power line: According to the electrical drawings, connect the power line to the equipment electrical control box to ensure that the power voltage matches the equipment requirements.

-Grounding protection: Connect the grounding wire of the equipment to ensure its safe grounding.

Control system connection

-Signal line: Connect the control signal line to the equipment control system to ensure normal transmission of control signals.

-Detection equipment: Connect various detection devices, such as temperature sensors, ammeters, voltmeters, etc., to ensure the normal transmission of detection signals.

6. System debugging

Single machine debugging

-Power test: Power on and check the equipment's power supply to ensure that it is functioning properly and that there are no abnormalities in the electrical components.

-No load operation: Start the equipment, perform no-load operation, check the operating status and various parameters of the equipment.

Load debugging

-Feeding test: Gradually add materials, perform load operation, and check the sorting effect and operating status of the equipment.

-Parameter adjustment: Adjust the operating parameters of the equipment, such as magnetic field strength, feed speed, etc., according to the operating conditions to ensure that the equipment reaches the optimal operating state.

7. Equipment acceptance

Inspection and acceptance

-Equipment inspection: Check the installation quality of the equipment to ensure that all components are securely installed and functioning properly.

-Performance testing: Conduct equipment performance testing to ensure that the sorting effect and various parameters of the equipment meet the design requirements.

Handover acceptance

-Acceptance Record: Record the acceptance status of the equipment and fill out the equipment acceptance report.

-Handover procedures: After the installation and commissioning of the equipment is completed, the handover procedures of the equipment shall be carried out to ensure that the equipment is put into normal use.

conclusion

The installation steps of the electromagnetic dry powder magnetic separator need to be strictly carried out in accordance with the specifications to ensure the installation quality and operational effectiveness of the equipment. Through reasonable preparation, precise installation, and scientific debugging, the stable operation of equipment can be ensured, production efficiency can be improved, and efficient magnetic separation can be achieved.


Return
WhatsApp QR code