Why is the magnetic field of the flat magnetic separator normal but the iron cannot be removed completely?

2026-11-23

The flat plate magnetic separator has a simple structure and easy operation in wet iron removal from quartz sand, but many customers encounter a counterintuitive situation: the equipment itself is not faulty, and the magnetic field strength of the magnetic plate is normal after measurement, but the iron removal effect does not meet expectations. The problem often lies not inside the magnetic separator, but in the installation position, which is easily overlooked.

The distance between the magnetic plate and the slurry surface directly determines whether the magnetic field can "reach" iron impurities. Flat magnetic separators are usually installed in chutes or pipelines, with magnetic plates immersed in the slurry or arranged closely to the bottom of the trough. If the gap between the bottom of the magnetic plate and the bottom of the groove is too large during installation, and the slurry flows through the gap, the bottom material will be too far away from the magnetic plate, and the magnetic field force will rapidly decay. Actual measurements have shown that when the gap increases from 5mm to 15mm, the capture rate of weak magnetic particles in the bottom slurry by the magnetic plate may decrease by more than half. During installation, it should be ensured that the gap between the bottom of the magnetic plate and the bottom of the groove is controlled within 3-5mm, avoiding friction and preventing the slurry from "short circuiting" and slipping away from the bottom.

The incorrect installation angle of the magnetic plate and uneven distribution of slurry flow rate also affect iron removal. When the magnetic plate is installed parallel to the flow direction of the slurry, the slurry flows uniformly on the surface of the magnetic plate, and the magnetic particles have sufficient time to be adsorbed. If the inclination angle of the magnetic plate is too large, the slurry will flow faster above the magnetic plate and slower below, and the magnetic particles in the fast flow area will be washed away before they can adsorb. It is recommended to install the magnetic plate horizontally or slightly inclined along the flow direction of the slurry, with an inclination angle not exceeding 5 °. After installation, measure the flow velocity at each point above the magnetic plate using a flowmeter or water connection method. If the deviation exceeds 15%, adjust the angle of the magnetic plate or install a guide plate.

The length of the magnetic plate is insufficient or the number of series connections is insufficient, causing the slurry to flash by. The residence time of the slurry on the surface of the magnetic plate is directly related to the length and flow rate of the magnetic plate. When the length of a single magnetic plate is insufficient, the time for the slurry to flow through the magnetic plate may only be one or two seconds, and weak magnetic particles may not have enough time to be adsorbed. For working conditions with large processing capacity or high iron content, single-stage magnetic separation is often insufficient. It is recommended to connect two stages of magnetic separation in series, with the first stage of coarse selection reducing the iron content and the second stage of fine selection controlling it. When connected in series, a certain distance is left between the two magnetic plates to allow the slurry to have a buffering and mixing section in the middle, avoiding uneven distribution of iron impurities that are missed in the first stage and directly enter the second stage.

The installation location is close to the vibration source, and the magnetic plate has been subjected to long-term vibration, causing the magnetic system to loosen. If the flat magnetic separator is installed near the vibrating screen or feeder, it may be affected by low-frequency vibration for a long time, and the fixing bolts of the magnetic blocks inside the magnetic plate may loosen, resulting in local blind spots in the magnetic field distribution after the magnetic blocks are displaced. When installing, try to stay away from strong vibration equipment as much as possible. If it is impossible to avoid, install rubber vibration damping pads on the base of the magnetic separator. Every quarter, use a Gaussian meter to measure the magnetic field strength at multiple points along the surface of the magnetic plate. If it is found that a certain area is significantly lower, open it and check if the magnetic block has shifted.

The flat magnetic separator cannot be used immediately after being placed in the chute. The installation clearance, angle, stage, and vibration reduction measures must be matched with the on-site working conditions. Encountering problems during equipment operation, welcome to contact the technical team of Shandong Heavy Industry for communication: Manager Zhang 13583776655 (same as WeChat).