What should I do if the overflow and roughness of the blocked settling machine occur

2026-09-03

The obstructed settling machine is used for desliming and purification in wet grading of quartz sand, but the frequent occurrence of coarse particles (running coarse) in overflow is a problem encountered by many customers. The overflow of coarse sand not only results in a loss of production, but also increases the burden on backend equipment.

受阻沉降机设备案例现场.jpg

The rising water flow is too fast, and coarse particles are washed away before they can settle. The obstructed settling machine relies on the rising water flow to achieve particle size separation, and when the flow rate is too fast, coarse particles are also carried into the overflow. Excessive opening of the inlet valve or unstable water pressure can lead to excessive flow rate. A measuring cup can be used to take samples from the overflow port. If the content of -200 mesh is low and there are significantly more coarse particles in the overflow, the inlet valve should be turned down by one gear, observed for half an hour, and then sampled for testing to gradually find the optimal opening.

Fluctuations in feed concentration can also lead to coarsening. When the concentration of incoming materials fluctuates in the front-end, the water flow parameters of the settling machine cannot be synchronously adjusted in time. When the concentration suddenly increases, a large amount of material rushes in, and some coarse particles do not have time to settle before entering the overflow with the rising water flow. Suggest adding a buffer tank in front of the settling machine to stabilize the feed concentration. Sample and test the feed concentration once per shift, and promptly investigate the front-end dewatering screen or cyclone if fluctuations exceed 5% are found.

If it is found during daily inspections that the overflow color has darkened and the bottom discharge volume has decreased, it is likely that it has become rough and should be sampled and tested immediately. At least once per shift, check the overflow concentration and the content of -200 mesh in the overflow, and adjust the frequency of water flow and bottom flow discharge in a timely manner during the initial run.

For equipment operation related issues, please feel free to contact the technical team of Shandong Heavy Industry: Manager Zhang at 13583776655 (same as WeChat).